Table of Contents(Page UD-45)

Ultra-DekŪ ERECTION SEQUENCE
Step 13

LAST PANEL RUN

This roof system is designed to finish in the high on even footage buildings by using 24", 18", or 12" panels on the last run.

After laying the last insulation run, install the rake support over the insulation along the steel line. Lay the last panel run. Temporarily fasten the male leg to the rake support with vise grips.

If the panel ends 2"- 4" away from the rake support due to an out-of-square condition or other factors, simply install the panel clips. This system allows for the roof to be trimmed in the high.

CAUTION

The roof should be swept clean of any drill shavings at the end each day to prevent rust.

Back   Next