Ultra-Dek® ERECTION SEQUENCE
Step 11



FASTENER SEQUENCE
SUBSEQUENT RUNS ENDLAP

SUBSEQUENT RUNS
ENDLAP

Install back-up plate and tape sealer as in Step 5. However, on this and all subsequent runs, care must be taken to engage the tab on the side into the slot of the adjacent back-up plate. This procedure will assist in maintaining a 24" panel module.

Install clips as described in Step 6.

Install upper panel as described in Steps 7 & 8.

Repeat the endlap procedures as required for each panel until the ridge is reached.