Table of Contents(Page UD-41)

Ultra-DekŪ ERECTION SEQUENCE
Step 9
  

RIDGE PANEL

At the ridge, install a back-up plate as in Step 5. The back-up plate is necessary to maintain panel module.

Install Tri-Bead tape sealer over prepunched holes. Be sure to place the tape sealer over the male leg. DO NOT REMOVE THE PROTECTIVE PAPER AT THIS TIME, EXCEPT AT THE MALE LEG.

Install clips on ridge panel as in Step 6.

CAUTION

Placing the tape sealer over the male leg of the panel is important Without it, water could be driven behind the outside closure by a strong wind.

Back   Next