| Table of Contents(Page UD-41) |
Ultra-DekŪ ERECTION SEQUENCE
Step 9
![]() ![]() |
|
|
RIDGE PANEL At the ridge, install a back-up plate as in Step 5. The back-up plate is necessary to maintain panel module. Install Tri-Bead tape sealer over prepunched holes. Be sure to place the tape sealer over the male leg. DO NOT REMOVE THE PROTECTIVE PAPER AT THIS TIME, EXCEPT AT THE MALE LEG. Install clips on ridge panel as in Step 6.
|