Table of Contents(Page UD-35)

Ultra-Dek® ERECTION SEQUENCE
Step 4 (cont.)



FASTENER SEQUENCE
FIRST RUN
EAVE

FIRST PANEL

Attach the panel to the eave strut and metal inside closures with Fastener #1 E. Eight fasteners are required at this location.

NOTE: IT IS ESSENTIAL THAT THE ERECTOR MAINTAIN A 24" MODULE AT THE EAVE, WITH THE PROPER INSTALLATION OF THE INSIDE CLOSURES AND BY INSTALLING FASTENERS IN THE PROPER SEQUENCE.

CAUTION

Do not, under any circumstance, step on the panel at the seam or at the panel ends until the adjacent side. end panels of eave fasteners are fully attached, The root panel may not support the weight of a man at those locations and could affect panel module.

CAUTION

The roof should be swept clean of any drill shavings at the end of each day to prevent rust.