| Table of Contents(Page UD-15) |
Ultra-Dek® SPECIFICATIONS
|
G.
Finish: [# choose one] H. Color: I.
Acceptable manufacturer: # Insert: Architect’s (owner’s) method of approval of "or equals". J. Other manufacturers desiring approval, comply with Section 01630. K. Acceptable Curb and
Equipment Support units: L. Prefabricated Roof
Jacks: M. Rooftop Walkways: 2.02 MISCELLANEOUS MATERIALS A.
Fasteners: B.
Closures: C. Accessories: 1. Provide all components
required per the metal roof system
manufacturer’s approved shop drawings for a complete metal roof system to include panels, panel
clips, trim/flashing, fascias, ridge,
closures, sealants, fillers and
any other required items. |
2.03 FABRICATION
A. Material shall be in-line tension leveled prior to roll forming panel profile. B. Where possible, roll form panels in continuous lengths, full length of detailed runs. C. Standard panel length shall be no more than 45 feet long (for longer length availability, contact manufacturer). D. Fabricate trim, flashing and accessories to detailed profiles. E. Fabricate trim and flashing from same material as panel. 2.04 PREFABRICATED CURBS AND EQUIPMENT SUPPORTS A. General: Comply with loading and strength requirements as indicated where units support other work. Coordinate dimensions of curbs and supports with equipment supplier/manufacturer. B. Fabricate curbs of structural aluminum (Min. .080 in. thickness for mechanical gear up to 1000 Ibs; .125 in. thickness for mechanical gear between 1000 lbs. and 2000 lbs.; use a two curb system per the manufacturer above 2000 lbs.), factory primed and prepared for painting with mitered and welded corner joints. Provide integral base plates and water diverter crickets. The upper flange of the curb must be a minimum of 15" above the water diverter. (This allows 12" of free area after the panel is lapped over the flange on the high side.) Curbs shall be designed to install under metal roof systems on the high side and over the metal roof system on the low side. C. Minimum height of curb shall be 8" above finished metal roof system. D. Curbs shall be constructed to match slope of roof and provide a level top surface for mounting equipment. E. Curb flanges shall be constructed to match configuration of roof panels. F. Curb manufacturer will provide its own curb structural support system that can be installed between the purlins that will allow proper thermal movement of the curb with the roofing system. G. Submit roof curb manufacturer’s shop drawings to metal roof system manufacturer for approval before fabrication of curbs. |