"PBR" PANEL PRODUCT INFORMATION

←Previous Page Next Page →
Table of Contents

Page 7

CONSTRUCTION NO. 542
UL 90 LIGHT TRANSMITTING PANEL INSTALLATION

Install roof panels, leaving the light transmitting panel run open, except for lower light transmitting panel run panel. Install tape sealer to panel sidelaps and across panel width as normal.

 

Attach light transmitting panels at the low and mid-slope connection to the purlin with nine Fastener #43 (1/4-14 x 1 1/4" driller with 1 1/8" O.D. washer).

 

Back   Next