TYPICAL DETAILS

Gutter

Notes:

Eave Gutter

  1. Attach gutter to eave strut with three Fastener #14 pop rivets per section.
  2. Install inside closures to top leg of gutter with 1/2" x 3/32" tape sealer top and bottom.
  3. Install "PBR", "PBU" or S-36® panel with Fastener #3 (12-14 x 1 1/4" Long Life driller) on each side of major ribs (two fasteners per foot). Fasteners must be installed up slope from inside closures.
  4. Gutter laps should be approximately 3" with a bead of urethane sealant in between. Install a sufficient amount of pop rivets to hold lap together.
  5. Install gutter straps 3'-0" on center with Fastener #4 (1/4"-14 x 7/8" Long Life Lap Tek) fasteners at each end.

Hang-on Gutter

  1. Attach Box Panel Cap Trim to top of eave strut with pop rivet #14 (three per 10'-0" section).
  2. Install inside closure on top of Box Panel Cap Trim with 1/2" x 3/32" tape sealer top and bottom of closure.
  3. Install "PBR", "PBU", or S-36® panels with Fastener #3 (12-14 x 1 1/4" Long Life driller) on each side of major ribs (two fasteners per foot). Fasteners must be installed up slope from inside closures.
  4. Attach gutter to roof panels with Fastener #4 (1/4"-14 x 7/8" Long Life Lap Tek) at each end.
  5. Gutter laps should be approximately 3" with a bead of urethane sealant in between. Install a sufficient amount of Fastener #14 (pop rivets) to hold lap together.
  6. Install gutter straps 3'-0" on center with Fastener #4 (1/4"-14 x 7/8" Long Life Lap Tek) at each end.