"PBR", "PBU", & S-36® PANEL PRODUCT INFORMATION

←Previous Page Next Page →
Table of Contents

Page 22

TYPICAL DETAILS

Valley


Notes:

  1. For valleys 30' or less in length, use standard valley trim. Valleys over 30' in length require extended valley trim.
  2. Apply triple bead tape sealer to valley trim parallel to the slope of the valley. Lower edge of tape sealer should be 4 1/2" from center of valley for standard valleys and 9" from the center of the valley for extended valleys.
  3. Install high rib section of inside closure that has been field cut from standard 3'-0" straight closure.  Place the cut closure square with the rib of the panel.  Install Tri-Bead tape sealer to top of inside closure prior to laying panel edge down on top of the cut closure.  The triple bead tape with proper fastener sequence will seal the minor ribs of the panel that are between the major ribs.
  4. Bevel cut "PBR", "PBU", or S-36® panels to fit slope of valley and install to valley with Fastener #3 (12-14 x 1 1/4" Long Life driller) at 4" on center. Fasteners must be installed through the closures and into triple bead tape sealer.
  5. Trim laps should overlap approximately 6" with a bead of urethane sealant in between. Do not rivet valley laps together. If laps gap open, install Fastener #4 (1/4"-14 x 7/8" Long Life Lap Tek) into each side of water diverter while holding lap tightly together.

Back   Next