Table of Contents(Page DL-63)

Double-LokŪ SPECIAL ERECTION TECHNIQUES
CURB INSTALLATION


Install top run of panels cutting the panels at each side of the curb to fit. Apply urethane sealant to seams of all panels that seal to the inside cap cells on the upslope end of the curb. End of top panels should be a minimum of 12" from the point of the water diverter. Top panel should lap onto curb 3".

Install cinch straps at sides and top of curb to form a compression seal. Fasten cinch straps with Fastener #1 E at 3" O.C. Fasteners must go through the Triple Bead tape sealer.

Full length panels may now once again be used. For drawings with call-outs, see page DL-64.

Back   Next