Table of Contents(Page DL-44)

Double-LokŪ ERECTION SEQUENCE
Step 12


SUBSEQUENT RUNS
RIDGE/OUTSIDE
CLOSURE

Install back-up plate, taking care to engage the tab on the side with the slot on the adjacent back-up plate.

Install temporary Fastener #1 E and Tri-Bead tape sealer as described in Step 9.

Install clips as described in Step 6.

CAUTION

Installing tape sealer to the male leg is important, without it, water could be driven behind the outside closure by a strong wind.

Back   Next