Table of Contents(Page DL-41)

Double-LokŪ ERECTION SEQUENCE
Step 9


RIDGE PANEL

At the ridge, install a back-up plate as in Step 5. The back-up plate is necessary to maintain panel module.

Temporarily install Fastener #1 E in the holes at each side of the panel. This will help maintain panel modularity at the ridge.

Install Tri-Bead tape sealer across the profile of the male leg at the ridge. This tape sealer will be centered 1 1/2" from the end of the panel, which is also in alignment with the prepunched holes. DO NOT INSTALL TAPE SEALER ACROSS PANEL AT RIDGE AT THIS TIME.

Install clips on ridge panel as in Step 6.

CAUTION

Installing the tape sealer to the male leg at the ridge is important. Without it, water could be driven behind the outside closure by a strong wind.

Back   Next