| Table of Contents(Page DL-4) |
Double-Lok® ENGINEERING
UNDERWRITERS LABORATORIES APPROVAL
Double-Lok®
|
Construction |
Panel |
Gauge |
Clip |
Clip |
Substrate |
UL-2218 |
UL-263 |
UL-580 |
|
180C |
24 |
24 min. |
A |
5'-0" |
Composite System |
Class 4 |
Class A |
Class 90 |
|
287 |
24 |
24 min. |
A |
5'-0" |
Open Framing |
Class 4 |
Class A |
Class 90 |
|
308A |
24 |
24 min. |
A |
5’-0" |
Composite System |
Class 4 |
Class A |
Class 90 |
|
450 |
24 |
24 min. |
A |
5'-0" |
Open Framing |
Class 4 |
Class A |
Class 90 |
|
538 |
24 |
24 min. |
B |
5'-0 1/4" |
Open Framing |
Class 4 |
Class A |
Class 90 |
|
539 |
24 |
24 min. |
B |
5'-0" |
Composite System |
Class 4 |
Class A |
Class 90 |
|
540 |
24 |
24 min. |
B |
5'-0 1/4" |
Composite System |
Class 4 |
Class A |
Class 90 |
A — Articulating
B — Floating or Articulating
NOTES
FACTORY MUTUAL APPROVAL
Double-Lok®
|
Panel |
Gauge |
Clip Type |
Clip |
Substrate |
Hail Damage |
ASTM E108 |
FM Windstorm |
|
24 |
24 |
** |
4'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-60 |
|
24 |
24 |
** |
5'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-60 |
|
24 |
22 |
** |
5'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-75 |
|
24 |
22 |
** |
4'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-90 |
|
18 |
24 |
** |
5'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-90 |
|
24 |
22 |
Floating |
3'-6" |
Open Framing |
Class 1-SH |
Class A |
Class 1-105 |
|
24 |
22 |
Articulating |
4'-0" |
Open Framing |
Class 1-SH |
Class A |
Class 1-105 |
**Floating or Articulating
NOTES
ICBO APPROVAL
Double-Lok® Roofing System details, engineering calculations, computer printouts, and data have been examined by the ICBO Evaluation Service, Inc. and have been found to comply with the 1997 Uniform Building Code.