Table of Contents(Page DL-35)

Double-Lok® ERECTION SEQUENCE
Step 4 Cont.


FASTENER SEQUENCE
FIRST RUN — EAVE

FIRST PANEL

Attach the panel to the eave strut and metal inside closures with Fastener #1 E. Eight fasteners are required at this location.

NOTE: IT IS ESSENTIAL THAT THE ERECTOR MAINTAIN A 24" MODULE AT THE EAVE, WITH THE PROPER INSTALLATION OF THE INSIDE CLOSURES AND BY INSTALLING FASTENERS IN THE PROPER SEQUENCE.

CAUTION

Do not, under any circumstances, step on the panel at the seam or at the panel ends until the adjacent side, end panels or eave fasteners are fully attached. The roof panel may not support the weight of a man at these locations and could affect panel module.

CAUTION

The roof should be swept clean of any drill shavings at the end of each day to prevent rust.

Back   Next