| Table of Contents(Page DL-29) |
Double-Lok® ERECTION SEQUENCE
Step 2
|
|
|
|
|
LOW SYSTEM EAVE For applications in which the wall panels have already been erected, install box panel cap trim to the eave strut with Fastener #14. Trim must be pulled tight to wall panels before fastening to eave strut. Use two fasteners per 10' piece or 3 fasteners per 20' piece. For applications in which the wall panels have not been erected, use offset panel cap trim. Lay Tri-bead tape sealer on top of the panel cap trim (box or offset). Install double faced tape along the length of the top leg of the panel cap trim (box or offset). Double faced tape must be upslope from Tri-Bead tape sealer. Lap box or offset panel cap trim 3". Apply two beads of urethane sealant between the trim pieces, approximately 2-˝" from the end of the bottom piece. |