Double-LokŪ ERECTION SEQUENCE
Step 1
![]() ![]() |
![]() |
||
|
RAKE SUPPORT Attach the rake support on top of the rake angle with the proper self-drilling fasteners on 2'-0" centers with a fastener in the first and last prepunched slot. The vertical leg is to be installed flush with the steel line. Center fasteners in slots.
IT IS IMPORTANT THAT THE RAKE SUPPORT IS
INSTALLED STRAIGHT AND SQUARE WITH THE EAVE AS IT CONTROLS THE ALIGNMENT
OF THE Install 6" long pieces of double faced tape on 3'-0" centers to the top of the horizontal leg of the rake support. This will help hold the insulation in place at the rake.
|