Double-Lok® SPECIFICATIONS
|
6. Thermal Loads # Specifier: Select applicable building code for paragraph A.1 Select Temperature differential for paragraph A.6. B. Framing Members Supporting the SSSMR System 1. Any additions/revisions to framing members supporting the SSSMR system to accommodate the manufacturer/fabricator’s design shall be submitted for review and approval. New or revised framing members and their connections shall be designed in accordance with [\AISC\] [\-AISI-\] [\SJI\] design specifications. Maximum deflection under applied live load, snow, or wind load shall not exceed [# choose one: L/180, L/240] of the span length. 1.05 SUBMITTALS A. Shop drawings: 1. Submit complete shop drawings and
erection details, approved by the metal roofing manufacturer, to the
architect (owner) for review. Do not proceed with manufacture of roofing
materials prior to review of shop drawings and field verification of all
dimensions. Do not use drawings prepared by the architect (owner) for shop
or erection drawings. B. Performance Tests: 1. Submit certified test results by a recognized testing laboratory or manufacturer’s lab (witnessed by a professional engineer) in accordance with specified test methods for each panel system. C. Calculations: 1. Submit engineering calculations
defining cladding loads for all roof areas based on specified building
codes, allowable clip loads and required number of fasteners to secure the
panel clips to the designated substructure. |
4. Submit
drainage calculations for valley, gutter, and downspout designs for a
rainfall intensity (inches per hour) of [# choose one: 5 year or 25 year
recurrence] for a 5 minute duration. (See MBMA Low Rise Building Systems
Design Manual Section A22 for Wind, Snow, Seismic, and Rain Data by
County) 5. Submit thermal calculations and details of floating clip, flashing attachments, and accessories certifying the free movement in response to the expansion/contraction forces resulting from a total temperature differential of 110 degrees F D. Samples: 1. Submit samples and color chips for
all proposed finishes. E. Warranty(s): 1. Covering bare metal against rupture,
structural failure and perforation due to normal atmospheric corrosion
exposure for a period of 20 years. F Test Reports: 1. Submit Test Reports showing that
metal panels meet the air infiltration requirements of ASTM E 1680-95 when
tested with a 6.24 PSF pressure differential with resulting air
infiltration of 0.0071 cfm/sq ft. G. Metal roof system fabrication certification: 1. Submit a letter from the metal panel manufacturer certifying the Double-Lok® panels have been produced in a factory environment (not job site) with fixed-base roll forming equipment. H. Installation contractor’s qualifications: 1. Submit certificate from manufacturer certifying that installer of the metal roof system has met all of the criteria outlined in "1.02 C. Installer’s qualifications" and is an authorized installer certified by the manufacturer within one year of the beginning of installation of the metal roof system. |