| Table of Contents(Page DL-11) |
Double-Lok® SPECIFICATIONS
SECTION 07610
Metal Roofing
| Specifier:
Notation [#] means that text following is a specifier’s note or sample.
PART 1 - GENERAL # Specifier: Do not alter paragraph A. except by adding section title in brackets. A. General:
1. Furnish all labor, material, tools, equipment and
services for all preformed roofing as indicated, in accord with provisions
of Contract Documents. B. Related work
specified elsewhere:
1. Structural steel: Section 05100. # Specifier: Delete references to
sections not used and add 1.02 QUALITY ASSURANCE A. Applicable standards: 1. SMACNA: "Architectural Sheet Metal Manual" Sheet
Metal and Air Conditioning Contractors National Association, Inc. |
B.
Manufacturer’s qualifications:
1. Manufacturer has a minimum of three years experience in manufacturing metal roof systems of this nature. Panels specified in this section shall be produced in a factory environment (not job site roll formed) with fixed-base roll forming equipment assuring the highest level of quality control. A letter from the manufacturer certifying compliance will accompany the product material submittals. C. Installation contractor’s qualifications: 1. Installer of the system shall be an approved installer, certified by the manufacturer, before beginning of installation of the metal roof system, specifically for ASBC’s Double-Lok® roof system and meet the following minimum criteria:a. Maintain a $250,000 general liability coverage for each loss. b. Maintain sufficient worker’s compensation coverage as mandated by law. c. Has no viable claims pending regarding negligent acts or defective workmanship on previously performed or current projects. d. Has not filed for protection from creditors under any state or federal insolvency or debtor relief statutes or codes. e. Project foreman is the person having received specific training in the proper installation of the specified system and will be present to supervise whenever material is being installed. Specific training program shall include the following: 1. The instructor must have a minimum of 10 years’ experience. 2. A formal curriculum. 3. Classroom instruction with review and thorough understanding of the specific product’s technical manual. 4. Hands-on mock-up instruction with a review and thorough understanding of the specific product’s details. 5. The installer must pass a written and oral exam. f. Provide five references from five different architects or building owners for projects that have been in service for a minimum of two years, stating satisfactory performance by the installer. g. Provide certification letter that installer has a minimum of three years’ of metal product installation experience immediately preceding the date upon which work is to commence. D. Pre-installation
Conference:
1. Prior to installation of roofing system, conduct a
pre-installation conference at the project site. |